| Description: | This solid concrete dam with hydro-power plant built in 1936 - 1940 is the first dam with tailrace spillway. The dam is 120 m long in the crest and 34 m high. |
| Categories: | reservoir, technical monument |
| Description: | This solid concrete dam with hydro-power plant built in 1936 - 1940 is the first dam with tailrace spillway. The dam is 120 m long in the crest and 34 m high. |
| Categories: | reservoir, technical monument |
covered swimming pool, fitness centre, outdoor ping-pong, sauna, solarium, outdoor sports ground, indoor jacuzzi
Brno